PhD and MSc Theses
PhD and MSc Theses, since 1988
| Advisor | PROFESSOR EMERITUS Abraham Warszawski (Deceased) |
|---|---|
| No of theses | 18 |
| Department | Civil and Environmental Engineering |
| Department Web Site | cee.technion.ac.il/?lang=he |
| Student's Name | Graduation Year | Degree | Abstracts | Research Name |
|---|---|---|---|---|
| Sacks Rafael | 1998 | PhD | Computer Integrated Construction: Project Data Model Representation and Use | |
| Segal Dan Sorin | 1995 | PhD | Economic Aspects of Seismic Design under Local Conditions | |
| Shohet Igal-Meir | 1994 | PhD | An Intelligent System for Mapping and Planning of Building Tasks by the Interior Finishing Robot | |
| Shaked Ory | 1993 | PhD | Knowledge-Based System for Construction Planning Of High Rise Buildings | |
| Argaman Hanna | 1990 | PhD | Development of a Model for Robotization Planning on the Buil | |
| Retik Arkady | 1990 | PhD | Development of Computerized System for Integrated Design | |
| Paz-Chen Itay | 2009 | MSc | Abstracts | Analysis of Financial Ratio for Construction Companies |
| Sharon Uri | 2005 | MSc | Abstracts | The Economic Aspect of Service Systems in Residential High Rise Building in Israel |
| Shalge Doron | 2002 | MSc | Abstracts | Utilization of Management Control System in Construction Companies |
| Doron Guy | 2001 | MSc | Examination of Methods for Information Transfer between the Owner and the Concessionaire in BOT Projects | |
| Dekel Gilad | 2001 | MSc | The Sources and the Cost of Financing in Building Projects | |
| Wang Chen | 1999 | MSc | Sensor Driven Mapping of Reinforcement Bars | |
| Cameo Shay | 1995 | MSc | The Factors That Influence the Value of Land in Israel | |
| Sheatrit Eythan | 1994 | MSc | Direct and Indirect Evaluation of Intagibles in Civel Engin | |
| Zajicek Uri | 1992 | MSc | Development of Building Application in Robotics Technology | |
| Peretz Abraham | 1991 | MSc | Mangerial and Economical Acpectof Erection Temple Mound Site | |
| Shaked Ory | 1990 | MSc | Development of An Expert System for Scheduling Repetitive |
